Here at Air & Water Balancing Services, our team of specialized technicians have the knowledge and skills to complete any project. From small tenancy fit outs to multi-million dollar projects. Here are some of the projects we have completed over the years.
Campbelltown Hospital Redevelopment (Stage 2)Client: FREDON AIR (NSW) Time Frame: August 2021 to May 2022. Scope of work: Balancing and commissioning of all HVAC systems serving zones 1 to 4 (Levels 1 to 10).Some of these systems include: Isolation Room Systems, Operating Theatres Systems, Sterile Storage Systems, Toilet Exhaust System, General Exhaust Systems, AHU Systems and FCU Systems, Heating ,Chilled and Condenser Water Hydronic Systems. | Crown (Sydney)Client: FREDON Air (NSW) Time Frame: January 2021 to December 2021. Scope of work: Balancing and commissioning of HVAC systems from L.6 to L.70 .Some of these systems include: FCUs serving apartments. Toilet Exhaust Systems, Kitchen Exhaust Systems, AHU Systems and General Exhaust Systems. | 101 George St, ParramattaClient: Precise Air Time Frame: October 2021 to November 2021. Scope of work: Dilapidation of all HVAC and Hydronic Systems through out the building. Some of these systems include, AHUs Systems with VAVs. FCU Systems, Toilet Exhaust Systems. Tenancy Out Side Air Systems. Car Park Exhaust Systems. Car Park Supply Systems. Chilled Water Hydronic System. Heating Water Hydronic systems. |
---|---|---|
Western Cancer Cetre DubboClient: State Wide Mechanical Services Time Frame: June 2021 to December 2021. Scope of work: Balancing and commissioning all HVAC systems serving this building. Some of these systems include, Cytotoxic Room Systems, Toilet Exhaust System, General Exhaust Systems, AHU Systems and FCU Systems. Heating ,Chilled and Condenser Water Hydronic Systems. | Goulburn Hospital & health Service RedevelopmentClient: FREDON AIR (ACT) Time Frame: March 2021 to December 2021. Scope of work: Balancing and commissioning of all HVAC and hydronic systems. Some of these systems include, Isolation Room Systems, Operating Theatres Systems, Sterile Storage Systems, Toilet Exhaust System, General Exhaust Systems, AHU Systems and FCU Systems. Heating ,Chilled and Condenser Water Hydronic Systems. | Adina Hotel, George StClient: FREDON AIR (NSW) Time Frame: September 2020 to March 2021. Scope of work: Balancing and commissioning of all HVAC and Hydronic systems through out the building. Some of these systems include, Apartment FCUs, Toilet Exhaust System, Kitchen Exhaust Systems, Carpark Exhaust Systems, Carpark Supply Systems and Stair Pressurization Systems. |
Oran Park Commercial 1Client: State Wide Mechanical Services Time Frame: January 2020 to April 2020 Scope of work: Balancing and commissioning of all HVAC and hydronic systems through out the building. Some of these systems include: Tenancy FCUs, Toilet Exhaust Systems, Out side air Fan, Carpark Exhaust Systems, Carpark Supply Systems and Chilled Water Hydronic Systems. | SOPA PROJECT (PAVILIONS by mirvac)Client: Twinlakes Air & Solar Time Frame: October 2019 to June 2020. Scope of work: Balancing and commissioning of carpark exhaust systems, lobby supply fans and the testing of stair pressurization systems in buildings 1, 2, 3 and 5. Some of these systems include: Car park exhaust fans, Car park supply fans and Supply air fans to lobbies. Testing and setting of stair pressurization systems serving tower and carpark stairs. | Western Sydney Performing Arts CentreClient: State Wide Mechanical Services. Time Frame: August 2019 to December 2019 Scope of work: Balancing and commissioning of all HVAC and Hydronic systems throughout the building. Some of these systems include: AHU Systems and FCU Systems, Chilled Water Hydronic Systems, Hot Water Hydronic Systems, Toilet Exhaust Systems, Kitchen Exhaust Systems and Smoke Exhaust Systems. |
Parklea Correctional Centre ExpansionClient: Sate Wide Mechanical Services Time Frame: Scope of work: May 2019 to January 2020 Balancing and commissioning HVAC systems serving Buildings 01-A, 01-D, 03, 06, 07a, 10 and the Gate House. Some of these systems include: Energy Recovery Ventilation Systems, FCU systems, General Exhaust Systems and Outside Air Fan Systems. | ECRL Train StationsClient: FREDON AIR (NSW) Time Frame: November 2018 to April 2019 Scope of work: Balancing and commissioning of Supply air fans serving underground platforms and setting chilled water hydronic systems at Epping, Macquarie University, North Ryde and Macquarie Park Train Stations. Some of these systems include, Supply Air Fan Systems. Chilled Water Hydronic Systems. | Arc by CrownClient: Baratech Time Frame: April 2018 to September 2018 Scope of work: Balancing and commissioning of HVAC and Hydronic systems. Some of these systems include: Apartment FCU Systems, Apartment Toilet Exhaust Systems, Lobby Supply PAC units, Garbage Exhaust Systems, AHU Systems, Condenser Hydronic System and Stair Pressurization Systems. |
34-38 York Street,379-385 George StreetClient: Baratech Time Frame: May 2018 to November 2018 Scope of work: Balancing and commissioning of HVAC and Hydronic systems. Some of these systems include: Apartment FCU Systems, Apartment Toilet Exhaust Systems, Lobby Supply PAC units, Garbage Exhaust Systems, AHU Systems, Condenser Hydronic System and Stair Pressurization Systems. | Gosford Hospital RedevelopmentClient: Lloyds TAB (Climatech) Time Frame: June 2017 to March 2018 Scope of work: Balancing and commissioning HVAC and Hydronic systems serving zone 1 (Levels 1 to 10). Some of these systems include: AHU Systems with the Calibration of VAVs, FCU Systems, Toilet Exhaust systems, General Exhaust Systems, Isolation Room Systems, Operating Theatre Systems, Chilled Hydronic Water Systems and Heating Hydronic Water Systems. | 2 Park StClient: Lloyds TAB (Econtrols) Time Frame: October 2016 to January 2018 Scope of work: All VAVs were upgraded for this project. Air & Water Balancing Services was given the task of calibrating all VAVs from Level 5 to 47 |
200 George St, SydneyClient: Lloyds TAB (Climatech) Time Frame: December 2015 to October 2016 Scope of work: Balancing and commissioning of HVAC and hydronic systems throughout the building. Some of these systems include: AHU systems with VAVs, FCU systems, Toilet Exhaust Systems, General Exhaust Systems, Carpark Exhaust systems, Carpark Supply Systems, Chilled Hydronic Water Systems and Heating Hydronic Water Systems. | Metro Residences ChattswoodClient: Baratech Time Frame: September 2013 to June 2014 Scope of work: Balancing and commissioning HVAC and Hydronic systems throughout all 3 apartment towers and commercial tenancy areas. Some of these systems include: Apartment FCU Systems, Apartment Toilet Exhaust Systems, Lobby Supply PAC units, Garbage Exhaust Systems, AHU Systems, Condenser Hydronic System and Stair Pressurization Systems. |